Main Central Station - Lehrter Station

Proof of Building Structures : Center of Berlin

  • New Minimized Bridge
  • 4 Bridge-Lines for 4 Railway-Tracks and 2 Metro-Tracks 10 m over Street Level with a Maximum of Height-Difference about 25 m to the Lowest Railway-Track in Level -2
  • 15 Reinforced-Concrete-Bridges on Restraint Steel Columns with Horizontal Connectivity Total Length/ Bridge-Line: 540 m
  • Span 15 - 25 m
  • Cross-Section Height 1,70 m
  • Specials: Restraint Bridge-Structure of Reinforced Concrete with Rolled Steel Columns, Cast Steel for the Center Columns (Fork Columns)
  • More Information see:
    • Stahlbau 71/2002 Heft 12 Verlag Ernst & Sohn Berlin .