Contact
MARION PRISTL
Dipl.-Ing.
Consulting Engineer
BREISGAUER STR. 14
D - 14 129 BERLIN
Germany
FON [+49] 030 - 88 92 59 35
www.mp-consult.de
This email address is being protected from spambots. You need JavaScript enabled to view it.
Main Central Station - Lehrter Station
Proof of Building Structures : Center of Berlin
- New Minimized Bridge
- 4 Bridge-Lines for 4 Railway-Tracks and 2 Metro-Tracks 10 m over Street Level with a Maximum of Height-Difference about 25 m to the Lowest Railway-Track in Level -2
- 15 Reinforced-Concrete-Bridges on Restraint Steel Columns with Horizontal Connectivity Total Length/ Bridge-Line: 540 m
- Span 15 - 25 m
- Cross-Section Height 1,70 m
- Specials: Restraint Bridge-Structure of Reinforced Concrete with Rolled Steel Columns, Cast Steel for the Center Columns (Fork Columns)
- More Information see:
- Stahlbau 71/2002 Heft 12 Verlag Ernst & Sohn Berlin .