+49-30-88925935 mp@mp-consult.de

Projects | References

Competitions, construction supervision & refurbishment concepts

  • Preliminary examination for the German Engineering Award 2022
  • Preliminary examination for the German Engineering Award 2020
  • Construction supervision demolition of existing building – Amt für kirchliche Dienste in Berlin

→ Refurbishment concepts for multi-family residential buildings as a supplement to property valuation reports

New buildings & structural additions

  • Structural calculations for detached houses with several storeys
  • Checking the maximum possible load in the existing building
  • Selection of a suitable substructure or load distribution for the technical systems
  • Verification in existing buildings with additional loads
  • Structural analyses for the substructures and anchorages

→ Checking the feasibility of installing technical systems on or in an existing office building

European Patent Office Berlin

BMUB competition ‘Art in architecture’

Structural engineering for the ‘European Patent Office’ refurbishment project in Berlin:

Design and approval planning

for .uD Planungsgesellschaft für Ingenieurbau/ Berlin

Historical recordings

Refurbishment of the Postfuhramt Berlin

Structural engineering for the Postfuhramt refurbishment project in Berlin

→ for .uD Planungsgesellschaft für Ingenieurbau/ Berlin.

2015

Combined solution Karlsruhe (Kombi-Lösung-Karsruhe)

Structural engineering for the infrastructure project in Karlsruhe

→ for .uD Planungsgesellschaft für Ingenieurbau/ Berlin

  • Building structures: Stops, tunnels and ramps – Solid construction in reinforced concrete
  • Special feature: Lowering the above-ground streetcar into a light rail tunnel to increase the capacity of local public transport
  • The project is presented by the client: www.vbk.info/die-kombiloesung

HumboldtHafenOne-Berlin-Mitte

Structural analysis of an office building in Berlin-Mitte

→ Dr.-Ing. H. Scholz – WTM Engineers/ Berlin

  • Building construction: solid construction in reinforced concrete / in-situ concrete with steel composite beams and columns
  • Special feature: the cantilevered 6 reinforced concrete storeys in the south are supported by a mega truss steel structure
  • The project – which is aiming for DGNB Gold certification – is presented by the client: edge.tech/humboldthafeneins ↑

2013/2014

Lapidarium/ Radialsystem III - Berlin Kreuzberg

Construction plans for the renovation and extension of the Lapidarium in Berlin-Kreuzberg

  • Building construction: solid construction in reinforced concrete / in-situ concrete
  • Special feature: new anthracite-colored reinforced concrete construction installed in the historic building core with a maximum projection of the gallery of 6.00 m, extension as solid construction in reinforced concrete / in-situ concrete, founded on piles

More info: AD Architectural Digest: Black Beauty – How an entrepreneur transformed an old pumping station… October 2012, p. 250 Publisher Conde Nast Offenburg

Berlin Architecture Award 2013 ↑

2011

Ritterstraße Berlin-Mitte

Construction plans for the new construction of an apartment building in Berlin-Mitte

 

Sparkassenversicherung / Kassel

Structural analysis and planning coordination for the refurbishment, extension and extension of the Sparkasse insurance company in Kassel

  • Building construction: Old building in reinforced concrete/ in-situ concrete or
  • Masonry construction with steel construction attic extension
  • on behalf of EHS-Ingenieure-KS, Architects HHS-KS

2011

Stadthalle Eschwege

Structural analysis and planning coordination for the renovation and extension of the Stadthalle/ Eschwege

  • Building construction: Reinforced concrete construction / in-situ concrete with wide cantilevered steel construction canopy
  • on behalf of EHS-Ingenieure-Kassel, Architects Reith+Wehner-Fulda

2011/ 2012

OVERFLY - Railway bridge north-east

Railroad bridge north-east – OVERFLY – Berlin Projects of transportation facilities in the central area – DB AG

  • Prestressed concrete bridge using the incremental launching method in an arch R= 411 m Bridge class UIC 71
    Width between the railings 10.70 m
    Bridge area 6,373 m2
  • 1 bridge for 2 mainline tracks with a ramp structure to connect to Lehrter station in the south
    10.50 m above ground level in Tegeler Straße with a maximum clearance height of approx. 16.50 m to the shipping canal and a minimum of 4.70 m to Perleberger Bridge
  • Prestressed concrete bridge on articulated reinforced concrete supports Total length/ bridge span: 570 m
  • Bridge spans from 30 – 50 m
  • Bridge cross-section height 2.70 m with variable cross-section

Further information/publications: Scarf-Report NOE No. 128/4 2000

 

Berlin Central Station - Lehrter Station Railway bridges

 

Railroad bridges – Berlin Central Station Project of the transportation facilities in the central area – DB AG

  • Innovative minimized bridge cross-section
  • 4 bridges for 4 mainline tracks and 2 suburban tracks 10 m above ground level with a height difference of approx. 25 m to the lowest mainline platform at level -2
  • 15 reinforced concrete bridges on prestressed steel supports with horizontal force coupling Total length/ bridge span: 540 m
  • Bridge spans from 15 – 25 m
  • Bridge cross-section height 1.70 m
  • Special features: clamped bridge structure made of reinforced concrete on steel supports, cast steel for the central hall supports (fork supports)

Further information/ publications: Stahlbau 71/2002 Issue 12 Publisher Ernst & Sohn Berlin